Lardum.Book a Review
A long machine shop aisle with the original line shafting and belt wheels still hanging from the ceiling above rows of machines.
A machine shop with its original line shafting still overhead.

Our services

Five ways to take AI from pilot to production: one for each level, plus where to start and how we stay.

Each one changes how people and processes work before building the AI that supports them. Most firms start with the Diagnostic.

Start with the Diagnostic

AI OperationsDiagnostic

2 to 4 weeks

Clarity before you commit to a build. We map how the work actually runs today, how people use the AI they already have, and which processes are worth changing first. You leave with a readiness view, a prioritised shortlist and a plan across all three levels.

  • How the work really runs, mapped
  • Current AI use surveyed
  • Data and tool readiness, rated
  • A prioritised shortlist and costed plan
More on AI Operations Diagnostic
An engineer's diagram of the Abingdon Wagon Co. buildings: the wagon, box and painting departments, the power plant and the railway sidings.
Abingdon Wagon Co., 1914. The survey of the buildings came before any machine was moved.

AI Adoption

4 to 6 weeks

Your team uses the AI it already pays for, in its own work. We find out how people use the tools today and why they have or haven't stuck, train them on their own tasks, and build champions in each team who bring the next group through.

  • How the team uses AI today, surveyed
  • Role-specific training on real work
  • Champions in every team
  • Shared skills on the licences you hold
More on AI Adoption
Mill workers stand beside a row of carding machines, every one driven by belts from a shaft along the ceiling.
A carding room in 1911. The machines paid only once the people running them knew them well.

Redesign& Deploy

From 2 weeks to live

One workflow, taken from pilot to production. We blueprint the process with the people who run it and simplify it first, then build and test the agent that runs it, wired into the tools your team already uses.

  • Process blueprinted before anything is built
  • A named owner for every decision
  • Tested against agreed answers before go-live
  • Baseline before, measured numbers after
More on Redesign & Deploy
A radial boring machine on a workshop floor around 1916, its drive pulley at the base and more belt-driven machines behind it.
A workshop around 1916. One machine, one belt, one job to do well.

IntelligenceCore Build

6 to 12 weeks

The core business infrastructure every AI workflow plugs into: the data boundary and connectors, the controls and audit trail, and your firm's know-how written down where a machine can read it. Each new workflow is then faster to put into production than the last.

  • Data boundary and connectors
  • Approvals, controls and audit trail
  • Shared skills library and decision records
  • Named owners and a roadmap
More on Intelligence Core Build
Looking up into a machine shop roof crowded with line shafts, pulleys and belts running down to the machines below.
The shafting every machine on the floor draws from.

Ongoing

AI OperationsPartner

Ongoing

A senior partner embedded in your operations across all three levels. The next workflow taken into production, the champions supported, the governance kept current, and a number on the table every quarter.

  • Senior, hands on the work
  • Each new workflow into production
  • Governance and ownership kept current
  • Quarterly results, in writing
More on AI Operations Partner

Start with
one workflow.

Thirty founder-led minutes. No pitch, no framework deck. We look at what you're already running, name the one workflow worth taking into production first, and tell you honestly whether it's worth doing.